Actualitat

Avís contaminació per PM10
23/04/2018

Activation of preventative warning stage for high levels of PM10

Pollution. Municipal services are taking preventative measures, such as more intense watering down of streets and avoiding the use of air blowers.

20/04/2018

New look for Rambla del Raval and the surrounding area

Neighbourhood Plan. The Rambla del Raval is to get a revamp, with Pl. Vázquez Montalbán and Pl. Salvador Seguí being adapted for more everyday use, fostering greater use by local residents.

15/04/2018

Enjoy the Bicycle Festival!

Events. Bicycles was the star attraction of a festival being held on Sunday, 15 April, along Passeig de Lluís Companys.

15/04/2018

Bikes in the streets to celebrate our festival!

Mobility. The Bicycle Festival 2018 included a mass bike ride, a fair for entities and associations and other activities for the general public, promoting sustainable mobility.

14/04/2018

Get on your feet and about the city

Walks. Barcelona City Council is getting a new group on its feet, under the 'Ens Movem programme, this coming 19 April, a collaboration between the Barcelona Sports Institute (IBE) and the Barcelona Public Health Agency(ASPB).

12/04/2018

Agreement to create a large public space around the Camp Nou

Urban planning. The transformation frees up 32,000 square metres for urban greenery and has been agreed on by local residents, FC Barcelona and municipal groups.

contaminació
04/04/2018

Traffic restrictions to include motorcycles which pollute the most

Pollution. Besides restrictions applying to cars during pollution episodes, as from December limits will also apply to pre-Euro 2 motorcycles and mopeds, mainly those registered before 2003.

01/04/2018

More bicycle parking facilities in Gràcia

Mobility. The district is adding 286 bike parking places near squares, schools and public facilities to facilitate mobility by bike and promote the use of healthier transport.

27/03/2018

#30diesAMBbiciBCN. Are you taking part?

Bicycles. Various cyclist collectives are joining forces to bring April bike showers to Barcelona and its metropolitan surroundings and to raise the profile of bicycles on social networks.

27/03/2018

A roof for the Ronda de Dalt

Urban planning. Work on the side support walls and the roof slabs between the Mercat de la Vall d’Hebron and Av. Jordà starts on Tuesday 27 March and will take ten months.

Pages